THE TILESETTER COMPANY
Close
Home
About us
Gallery
Testimonials
Contact
Bathroom services
Menu
SERVICES
Standard procedure of a bathroom renovation:
- Laying down drop clothes along the path leading to the bathroom
- Covering doorways if needed and plug vents to prevent dust
- Quick scanning of the bathroom and making mental notes what needs to be removed
- Start by disconnecting toilet and vanity
- Remove existing tiles from wall, then disconnect shower faucet
- Remove bathtub or shower tray
- Take up existing floor covering
- Remove towel bars, paper holders, mirror, light fixture, etc.
- Prep plumbing for new bathtub or shower tray and for new shower faucet (including replacement of old pipes with new if needed)
- Prep pluming for new vanity if needed
- Install new bathtub or shower tray including new shower valve rough-in
- Install new moisture proof boards in shower area and niche in wall if requested
- Install waterproofing membrane in shower area
- Install new tiles on bathtub/shower walls and in niche if there’s any
- Install uncoupling membrane on floor
- Install new tiles on floor and tile base on wall if requested
- Grout and silicone tiles
- We also install electric heated floor
- Prep walls (mud, tape, sand) for new paint
- Paint walls and ceiling
- Install new vanity with top and faucet
- Install new toilet
- Install new shower door if needed
- Install light fixture, mirror, towel bars, paper holder, etc.
- Inspect job, check everything works
- Final clean up
- Done and enjoy!
Brands we are using :
Laticrete
Schluter
Moen
Delta
Grohe
Kohler
Maax
You want a nice bathroom