THE TILESETTER COMPANY

Close
  • Home
  • About us
  • Gallery
  • Testimonials
  • Contact
  • Bathroom services
Menu

SERVICES

Standard procedure of a bathroom renovation:


  • - Laying down drop clothes along the path leading to the bathroom

  • - Covering doorways if needed and plug vents to prevent dust

  • - Quick scanning of the bathroom and making mental notes what needs to be removed

  • - Start by disconnecting toilet and vanity

  • - Remove existing tiles from wall, then disconnect shower faucet

  • - Remove bathtub or shower tray

  • - Take up existing floor covering

  • - Remove towel bars, paper holders, mirror, light fixture, etc.

  • - Prep plumbing for new bathtub or shower tray and for new shower faucet (including replacement of old pipes with new if needed)

  • - Prep pluming for new vanity if needed

  • - Install new bathtub or shower tray including new shower valve rough-in

  • - Install new moisture proof boards in shower area and niche in wall if requested

  • - Install waterproofing membrane in shower area

  • - Install new tiles on bathtub/shower walls and in niche if there’s any

  • - Install uncoupling membrane on floor

  • - Install new tiles on floor and tile base on wall if requested

  • - Grout and silicone tiles

  • - We also install electric heated floor

  • - Prep walls (mud, tape, sand) for new paint

  • - Paint walls and ceiling

  • - Install new vanity with top and faucet

  • - Install new toilet

  • - Install new shower door if needed

  • - Install light fixture, mirror, towel bars, paper holder, etc.

  • - Inspect job, check everything works

  • - Final clean up

  • - Done and enjoy!

Brands we are using :

Laticrete Laticrete

Schluter Schluter

Moen Moen

Delta Delta

Grohe Grohe

Kohler Kohler

Maax Maax

You want a nice bathroom

© All Rights Reserved - 2022 - The Tilesetter Company

Made with passion by BKNdesign